Design & Construction Costs
The estimates for total construction, design, development, and permitting costs for the Facility would be $70.5 Million and an additional $14.5 Million for the Optional Joint Field House Facility.
Annual Parcel Tax Assessment
Using a Property-based Special Tax Option, design and construction of the Facility would cost on average $472 per year / per parcel. Including the Field House Option would add an additional $99 per year / per parcel.
Additional user fees would be required and those would determined after opening.